Environmental Law · Venezuela · Environmental Series
Hazardous Waste in Venezuela
The current regime every company with operations in Venezuela must build into its planning from day one
María Eugenia Reyes · Ágora Abogados SC · 2026
⚗️
Generator
Produces the material or waste as a result of its activity. First link in the chain.
Key obligation
Registration with MINEC. Emergency plans. Bears the greatest liability.
→
🚛
Transporter
Moves the material between the generation point and the treatment or disposal site.
Key obligation
Must carry the safety data sheet, dispatch guide, and insurance policy at all times.
→
🏭
Storer
Temporarily holds the material under controlled conditions.
Key obligation
Prevent migration to the environment. Keep incompatible materials separate. Observe maximum storage time.
→
⚠️
Final-disposal operator
Treats, eliminates, or confines the hazardous waste.
Key obligation
Requires express MINEC authorization. Disposal only in authorized security landfills.